


West River Front Trail is a proposed trail in west and north Fort Smith between the Arkansas River and Clayton Expressway.
It begins at Garrison Avenue and the Mill Creek North Trail and extends north along the Clayton Expressway right of way and the Arkansas River floodplain.
The trail then curves east where it connects to the Softball Complex Trail and the bikeway on Williams Lane before it ends at the railroad.
This trail contains 2.5 miles of existing gravel trail currently used for recreation


The goal of this master planning endeavor is to facilitate the actual construction of as many trails and greenways in Fort Smith as possible.
We want to ensure those corridors are safe and located where they are needed and will be used, and also connect the major destinations within the city.
3301 South M Street • Fort Smith, AR 72903
P: 479.784.1006 • F: 479.784.2480
Parks Administration: alee@fortsmithar.gov